Image Not Available
The 27312 allows customers to send their IRGASON or EC150 to Campbell Scientific and have Campbell Scientific perform a zero and span; an RMA (Return Material Authorization) is required. The zero and span should be done when ambient conditions change significantly (i.e., seasonally).
The 26390 IRGASON and EC150 Zero and Span Shroud Kit is offered for customers who want to perform their own zero and span.
Read MoreWith time, the IRGASON and EC150 gas analyzers can experience some drift in signal offset and gain, especially under varying environmental conditions. Thus, a zero and span procedure (i.e., a simple two-point calibration) should periodically be performed on the analyzer.
The zero and span is usually performed in the order of several weeks or months. Anytime there is a significant change in ambient conditions (e.g., change in seasons) or when the instrument appears to have drifted, a zero and span should be done.
This service is available for the EC150 and IRGASON.
We've updated our privacy policy. Learn More
Update your cookie preferences. Update Cookie Preferences